Indore Metro gets only one bidder for package IN- 03



Indore, India (Metro Rail Today): In a recent move, Rail Vikas Nigam Ltd. (RVNL) has emerged as the sole bidder for constructing Indore Metro’s 10.927 km MR10 Road – Gandhi Nagar section on ‘Super Corridor’ road, after Madhya Pradesh Metro Rail Corporation opened technical bids. The Indore Metro project has finally got pace with two bids being opened today.

The name of the package is IN-03 which will include 9 elevated stations is Indore Metro Phase 1’s third civil package on the Yellow Line and the very first integrated package with both viaduct & station work.

MPMRC invited tenders for this package in March with an estimated cost of Rs. 1000 crore and completion period of 847 days. The project is being funded by both central and state government.

The tender no. of this bid is 273/MPMRCL/2021/Package IN-03 and its name of the  IN-03.

The Scope of the project includes Design and Construction of Elevated Viaduct between Ch.14+488 & Ch.25+415, viaduct connecting Depot leading upto interface location, Nine (9) Elevated Metro Rail Stations including all Civil, Structural, Roof structure, Mechanical, Electrical and Plumbing (MEP) works, Architectural finishes, Fa├žade, Entry/Exits, FOB, Viaduct within the stations including Transition spans” for Indore Metro Rail Project Yellow Line. 

Comments

Popular posts from this blog

Chennai Metro opens financial bid for the construction of underground stations for line 3

L&T begins construction work on Mumbai-Ahmedabad Bullet Train project

Apply in Gujarat Metro for CGM, GM, AGM, DGM, Manager posts